Case study A
Primary bathroom remodel
The bathroom was taken back to the structure: demolition cleared the dated dark tile surround, sunken garden tub, and built-in cabinetry.
The sequence moved through structural preparation and rough-in, with behind-the-wall plumbing brought up to code before finishes were installed.


Open full size ↗
Open full size ↗
Open full size ↗
Open full size ↗
Open full size ↗






















